Working Hour:
8:30 ~ 17:00 (Mon ~ Sun)
Hotline Direct:
+86 133 3306 4400 (WhatsApp)
Langfang Blue Water
International

Applications
The operation parameters can be set in advance on the surface, and the process requirements of double pipe sand flushing can be realized after adjustment.
Features
- Simple structure, can achieve three modes of ground preset;
- Variety of working modes and displacement can be set by adjusting the nozzle combination.
Sizes AVailability
| Model Number | Concentric Coiled Tubing Specification | Tools Size (mm) |
| 1402-200 | 2in x 1in | 63.5 |
| 1402-2375 | 2-3/8in x 1-1/4in | 73 |